Xenon Project is no longer in operation.

This website is maintained as reference material and a reminder
of a time before tech monopolies ruined the internet
and coronavirus ruined everything else.
Call us at 888-XENONRC | Open 10AM to 5PM PST Monday-Friday Contact | Support | Blog | Customer Login SV80 Long Lead 3-wire servo: T28
RC Helicopters, RC Cars, RC Airplanes, RC Trucks, RC Boats & RC Toys
You are here: Home > RC Airplanes > RC Airplane Parts > Replacement Parts > SV80 Long Lead 3-wire servo: T28

SV80 Long Lead 3-wire servo: T28

SV80 Long Lead 3-wire servo: T28

CLICK TO ENLARGE

SV80 Long Lead 3-wire servo: T28

PTE-R-H010 by ParkZone

Retail Price: $11.99
You Save $0.60 (5%)

$11.39

Out Of Stock - Check back soon or join our waitlist!

Features

  • Approximately 400mm lead length

In Depth

  • Length: 24mm
  • Width: 12mm
  • Height: 26mm

Review Summary

This product is covered by our limited warranty policy. We stand behind our products and all items are guaranteed to be in working order and fully functional. Any items found to be defective upon arrival will be repaired or replaced free of charge within 60 days of purchase.

Returns or exchanges of new and unused products will also be accepted up to 60 days after the date of purchase.

XenonProject.com 11312 Orchard St. Unit A. El Monte, CA 91731 USA  |  888-XENONRC (888-936-6672) M-F 10AM to 5PM PST© 2012 XenonProject.com
For full size Performance Car Parts, check out our affiliate Silicone Intake Systems.
SV80 Long Lead 3-wire servo: T28 SV80 Long Lead 3-wire servo: T28